|
The best location for a anti static bar is usually just after the area where the static charge is being generated or just before where the problem is located. Our electrostatic Fieldmeter provides an
easy way to identify the static build up causing your specific problem.
The AVALANCHE 200 feedback web/sheet ionizing system is easily mounted into any machine type. Make sure to mount the ionizer bar with a 0.5 – 1.5 in (12-30mm) gap above the substrate surface
that needs to be discharged. See Fig.1
Mounting Example: Web Ionization
The mounting brackets are attached to the frame of the machine above the web. The ionizer bar is placed above the area that is chosen. Rail configurations are custom made, please
check specifications for size “L”. See Fig.2

|